Engineering Facility
 
 
      Inspection: (Quality Assurance)
  • All Instruments are calibrated from NABL accredited Labs as per calibration plan.
  • All Raw Materials are tested both in-house and where required thro independent accredited Laboratories.
  • During Production Stage wise Inspection is carried out to ensure Zero Defects at final stages.
  • Minimum first 5 and last 2 samples are being checked during part or assembly production.
  • Complicated arc edge profiles are given a wire cut master sample for the in-process blank profile verification. Master samples are also treated as a fixture for the blank operation.

•Any change in drawing entails master sample modifications as per requirement.

      Fixtures :
  • All operations are given a specific fixture to save inspection time and manual errors.
  • Even Small operations like piercing, notching etc are also being given fixtures or GO-NO- GO gauges for in-process dimensions identification.
  • MSA study like R&R, Bias, Linearity, Cp- Cpk, Attribute, Variable etc are available.
  • Process capability, special process awareness is given to the concerned person with the help of FMEA.

Final Checking fixtures are also provided to customers for verification at their end.


     
 
  Home About Company Engineering Facility Products Range Clients  
  Contact us History & Profile Store Material Handling Chasis Parts Enquiry  
    Mission & Vision Shop Floor Door Parts    
    Organogram Tool Room Exhaust System    
      Quality Assurance Clutch & Lever    
      Training & Certification Accessories