Engineering Facility
 
Material Handling & Procurements
   
LK – Material Handling :
 

  • LK is using the CR & HR material from 80 Tons to 120 Tons Per Month and ERW Pipe Consumption is 40 MT / Month.
  • As LKs major work is on labor basis, the record of stock, scrap, value is very much controlled.
  • LK also keep a local supplier, only 1 Km away, for its regular material requirements.
 
     
  Purchase format Check Points :
  • Supplier location, capacity & its distance from LK, Contract time, % share of total requirement.
  • ISO 9001 – supplier minimum qualification is achieved.
     
  Home About Company Engineering Facility Products Range Clients  
  Contact us History & Profile Store Material Handling Chasis Parts Enquiry  
    Mission & Vision Shop Floor Door Parts    
    Organogram Tool Room Exhaust System    
      Quality Assurance Clutch & Lever    
      Training & Certification Accessories