 Engineering Facility |
|
|
Material Handling & Procurements
|
| |
|
LK – Material Handling : |
|
- LK is using the CR & HR material from 80 Tons to 120 Tons Per Month and ERW Pipe Consumption is 40 MT / Month.
- As LKs major work is on labor basis, the record of stock, scrap, value is very much controlled.
- LK also keep a local supplier, only 1 Km away, for its regular material requirements.
|
| |
|
|
|
| |
|
|
| |
Purchase format Check Points :
- Supplier location, capacity & its distance from LK, Contract time, % share of total requirement.
- ISO 9001 – supplier minimum qualification is achieved.
|
|
| |
|
|
|